Quote:
Originally Posted by mura_gadi
Sounds like you have enough soil for an embankment maybe?
Might be an idea to look at moving the soil to a windbreak if there is going to be major excavations.
Either that or make a barrier to keep flood water from going over the slab.
|
About a 1-1.2m fall across the site, so should be 5-600mm cut and fill
Can't wait to see finally see it...will be a good spot to pitch a tent too

..and
what an outlook!
Mike