Thread: Don't do it.
View Single Post
  #4  
Old 13-05-2019, 12:05 AM
Tandum's Avatar
Tandum (Robin)
Registered User

Tandum is offline
 
Join Date: Apr 2008
Location: Wynnum West, Brisbane.
Posts: 4,166
I've been told you need cabinets first then stone benchtops takes 2 weeks.
You need benchtops before splash backs. Glass splashbacks takes 2 weeks.
Then power points go in and finished
8 weeks sucxs
Reply With Quote