Quote:
Originally Posted by LewisM
They have already done that - we all got new copper here. Watched them doing it right outside our door.
Just waiting for them to tie it all in to the exchange etc. Telstra finished all the cabling etc about a month ago.
|
That's really good to hear. Double good if you didn't have to ask them to do it. The Copper can be good in small doses. I have a mate on FTTN (100m run?) who syncs at 108Mbit. His RSP product (100/40) is theoretically a bottleneck.