Not sure if you have already found your answer.
I googled the CPC manual and its DC requirements are 12V 1.5A (tip positive), so I would say a 2 or 3A fuse will be OK and should cover any switch on surges.
Cheers
Bill
Last edited by billdan; 16-04-2018 at 05:20 PM.
|