The pier is in

Dug a 600x600x400 hole and filled it with concrete mixed by hand. The base has 4 M10 bolts extending down with big washers for staying power. A couple of coats of etch primer and 3 of satin black all from spray cans. Happily it stayed level enough, and is facing true south so I hope for minimal Az adjustment. Three wood panels are on with Copper handles, cause I thought that would look really good...and it does. I made Brass cradles for the motor controller and Nexus unit.
Now to pull apart the EQ head and give it the same treatment.