View Single Post
  #6  
Old 04-09-2016, 02:17 PM
billdan's Avatar
billdan (Bill)
Registered User

billdan is offline
 
Join Date: Mar 2012
Location: Narangba, SE QLD
Posts: 1,551
There was a long thread on SGL about filling steel piers with sand or concrete. The consensus was not to fill the pier more than halfway, this avoids the pier being top heavy and leaves all the mass down low for better stability.

Cheers
Bill
Reply With Quote