Build up a new slab on top of the existing slab.
Pre drill and insert threaded rods into the old slab. Then build a box the same size as your base plate or bigger, make sure the rods have plenty of clearance to poke through the new slab, then pour, much easier to level wet concrete than a dry one.
Bo
|