OK - finally got around to taking some photos. Finished off some last few fixing jobs today. Left to do:
1. Seal the gaps in the floor
2. Seal around the base
3. Wire up the power and data
4. Install a solar powered ventilation fan
I'll then look at how hot it gets and whether insulation will be required.
The floor is very stable so I'm happy with how that worked out.
|