View Single Post
  #16  
Old 20-07-2015, 07:20 PM
daine042 (Daine)
Registered User

daine042 is offline
 
Join Date: Apr 2011
Location: singleton nsw
Posts: 84
Thanks again for the positive feedback. The track system is very basic, its just 4 100mm castors with the rubber wheel removed bolted to the shelter. The hub for the castors has a v shape and runs on some downee gate track. The weight of the structure holds it down on the rails and in the closed position it is locked with a couple hasp and staples. The true test of the relocatability will come in the next few weeks. Just get it all set up and we have to move haha.
Reply With Quote