Observatory progress
I'm going to be out of action after shoulder surgery in a few weeks so am madly trying to get as much done as possible.
The pier went in to 800 x 800 x 800mm of concrete a few weeks ago and this weekend the stump holes were dug and stumps installed.
Couldn't believe that a 3m x 3m shed needed 14 stumps but the layout meant I couldn't avoid it.
Still have to figure out which way the roof should roll to maximise my views and be a bit protected from the prevailing weather direction (south-west) but I'll have a few weeks in a sling to think about that. Any suggestions greatly appreciated.
cheers
niko
|