I do a separate centre section 900 deep x 1 x 1 on top then I leave a slight gap and then pavers for the floor. Works well.
Depends how large a scope you intend to mount as far as how large the central concrete will be. The larger/heavier the scope the bigger the concrete pier should be.

Pavers probably cool off a bit faster than a slab as well.

Greg.