View Single Post
  #13  
Old 01-03-2015, 09:18 PM
thunderchildobs
Registered User

thunderchildobs is offline
 
Join Date: Dec 2006
Location: Ipswich, Qld, Aust
Posts: 639
I have a single 4" concete floor for my observatory, with the pier bolted to it. The problem is the concreate sits on ground. Where i live, there is black soil that moves with the weather, eg wet / dry. I have a high quality bubble level on the the pier. In a week or two the pier moves. I need to constantly relevel the pier and adjust the polar alignment.

Since I am only in the observatory to setup / packup and image remotely, moving around in the observatory is not an issue.

Brendan