Quote:
Originally Posted by multiweb
I guess the heavier the structure, the less chance of rocking it, but for a small size obs I'd still separate pier from slab. Or have a separate floating deck.
|
well then i go back to my original idea? maybe i could get the outer part poured leaving a bell shaped are for the pier to be poured. so if i wrapped the black compose bin in the foam would that be enough buffer? therefore it would be done in two pours