View Single Post
  #3  
Old 03-05-2006, 04:20 PM
astro_nutt
Registered User

astro_nutt is offline
 
Join Date: Mar 2005
Location: Melbourne
Posts: 1,013
If you have enough "formatube"...try placing another 20 cm below ground..( I used a couple of plastic buckets with the bottom cut out and the tops screwed facing each other)..be sure the top of the "formatube" is level before and after filling with concrete.
Use gladwrap to protect the tops of the screwed shafts.
Cheers!
Reply With Quote