If you have enough "formatube"...try placing another 20 cm below ground..( I used a couple of plastic buckets with the bottom cut out and the tops screwed facing each other)..be sure the top of the "formatube" is level before and after filling with concrete.
Use gladwrap to protect the tops of the screwed shafts.
Cheers!
|