Move the dob - slide or partially
How do you guys move the dob(8" or 10")?
eg. move from garage to backyard, "dismantle" into the tube and base first
and then resemble the 2 things together, right?
But after you reached the backyard how about if you found the position is not good enough but need to move a bit further (1 metre to left, right... etc).
|