View Single Post
  #21  
Old 14-03-2014, 09:30 PM
mswhin63's Avatar
mswhin63 (Malcolm)
Registered User

mswhin63 is offline
 
Join Date: May 2009
Location: Para Hills, South Australia
Posts: 3,622
The top is on but still a while to go

Hi All,

Another update, the top half is sealed with some 4mm marine ply. The next stage is to seal the edges and install a continuous rubber strip on the lower section of the top half to allow water or rain to have less opportunity to flow into the lower half.

Since the photo I have block planed the edge and is much smoother transition from edge to edge.

Still considering locking arrangement for the lower half though.
Attached Thumbnails
Click for full-size image (20140314_175607.jpg)
74.2 KB85 views
Click for full-size image (20140314_175617.jpg)
65.7 KB73 views
Reply With Quote