Here are some construction pics for those that are interested.
1. Shed cleared out showing available space.
2. Roof off with the frame to hold it's shape commenced.
3 &4 Main support bearers in ready for ROR Frame and rails.
5 ROR frame with castor wheels mounted on rails, 20 mm U channel. Blocks on end are to stop the frame from rolling off. It was also necessary to glue in 9mm square dowels to ensure the wheels did not dig into the channel too far and get the right glide height. There is very little resistance and the operation is so smooth it's a one handed thing.
6. ROR finished, side skirts added.
7. front finished, filled needing sanding and paint.
8. Finished
|