Quote:
Originally Posted by iceman
Thanks for the feedback so far guys.
I hadn't thought about a different 'design' requiring re-plumbing or wiring. For that reason I think it'd be best to keep as close to original design as possible.
New tiles (up to the ceiling), new vanity/cabinet, new toilet, new shower/fixtures, will make it feel like new I guess 
|
Hint of the day:
Make sure you save at least a 1/2 box of matching tiles for any future issues,
I have just re-done a 15 yr old bathroom and was very lucky to find the same tiles hidden in a local warehouse. Usually tiles are 'unobtainium' after about 5 years.