Quote:
Originally Posted by alpal
Or it could have been lack of money.
|
Apparently $10,000,000 had already been allocated for the stabilization and upgrade of the cables.
An engineering program was being made when the first cable broke.
But in my opinion that was too late, it's fate was sealed.
Cables were braking at 60% strength.
No way back.
Cheers