#1  
Old 20-12-2019, 10:03 AM
morls (Stephen)
Space is the place...

morls is offline
 
Join Date: Sep 2009
Location: Melbourne
Posts: 696
Holiday Pier project

Hi,
This should be fun...got the mounting plate and micro piles from Surefoot in Coburg, looking forward to getting this set up over the next while. My site manager can be seen inspecting the hardware...
Cheers
Stephen
Attached Thumbnails
Click for full-size image (IMG_1249.jpg)
144.6 KB157 views
Click for full-size image (IMG_1250.jpg)
141.5 KB144 views

Last edited by morls; 20-12-2019 at 02:12 PM.
Reply With Quote
  #2  
Old 23-12-2019, 01:15 PM
morls (Stephen)
Space is the place...

morls is offline
 
Join Date: Sep 2009
Location: Melbourne
Posts: 696
Cut the micro-piles down to 450mm and installed the footing today. Took 1 hour, and seems very solid.
Attached Thumbnails
Click for full-size image (IMG_1254.jpg)
126.0 KB104 views
Click for full-size image (IMG_1255.jpg)
98.0 KB106 views
Reply With Quote
  #3  
Old 23-12-2019, 06:46 PM
morls (Stephen)
Space is the place...

morls is offline
 
Join Date: Sep 2009
Location: Melbourne
Posts: 696
And the finished job. Of course it's cloudy, but all seems very stable. It'll be interesting to compare this setup to the tripod.
Attached Thumbnails
Click for full-size image (IMG_1256.jpg)
106.8 KB108 views
Click for full-size image (IMG_1258.jpg)
108.7 KB108 views
Reply With Quote
  #4  
Old 24-12-2019, 12:00 AM
sharpiel
Registered User

sharpiel is offline
 
Join Date: Jun 2010
Posts: 715
Most of the good imagers and engineers here say (and logic seems to reinforce) that having a lovely rugged gusseted pier is let down by the weak link of the long bolts in the rat cage arrangement you have supporting the base of your beautiful pier. The longer those bolts (and yours are looooong) the more vibration and instability you'll introduced to that stiff pier.

Seek the advice of IIS members Wavytone (engineer) and Peter Ward (award winning imager).

Are you doing visual only (less important) or imaging?
Reply With Quote
  #5  
Old 24-12-2019, 06:42 AM
morls (Stephen)
Space is the place...

morls is offline
 
Join Date: Sep 2009
Location: Melbourne
Posts: 696
Hi Les,
Doing both visual and imaging. This is really a test run, as we'll be moving house at the end of 2020. That's one reason the micro piles were cut down, in order that removal would be easier.
These are long bolts, so I'll see how things go and hopefully will be able to do away with the rat cage in the next installation.
Cheers
Reply With Quote
  #6  
Old 24-12-2019, 04:09 PM
morls (Stephen)
Space is the place...

morls is offline
 
Join Date: Sep 2009
Location: Melbourne
Posts: 696
I think I might have posted this thread in the wrong forum - maybe "ATM and DIY projects" is a better fit.



How can I get in touch with a moderator to get this moved?
Reply With Quote
  #7  
Old 24-12-2019, 05:31 PM
DarkArts
Registered User

DarkArts is offline
 
Join Date: Dec 2014
Posts: 606
If you really want to get the attention of the mods, the quickest way is to post a lot of spam ....

PM 'RB" or 'houghy' ... those are the mods that I recall.

But I think this forum is fine for the subject matter - no need to move it.

I like the pier btw, but personally I would have used the larger size foundation (S500) and more pins, even for an EQ6.

Last edited by DarkArts; 24-12-2019 at 05:43 PM.
Reply With Quote
  #8  
Old 24-12-2019, 06:05 PM
Outcast's Avatar
Outcast (Carlton)
Always gonna be a NOOB...

Outcast is offline
 
Join Date: Oct 2008
Location: Cairns, Qld
Posts: 1,285
Quote:
Originally Posted by morls View Post
I think I might have posted this thread in the wrong forum - maybe "ATM and DIY projects" is a better fit.



How can I get in touch with a moderator to get this moved?
Stephen, I'm really watching this with interest... I'm keen to read about your progress, as well as your analysis on whether or not you think it's stable enough between now & your eventual move...

Would you mind elaborating on cost of the plate you used (I'd never seen those before) & whether you already had the pier or purchased it complete/had it made for you, etc... & rough costs...

I'm contemplating a few backyard options at present although my needs are a little different to yours as I also have a dob I want to settle on a more stable base rather than just grass. At present I'm contemplating a circular concrete pad, done in such a manner as to look like a decorative feature that I can mark a nth/sth line on for setting up my CG 5 but, the pier footing you have shown is also very interesting indeed...

FWIW, I have no issue with where it is either but, if you are super keen to have it moved you can either PM one of the mods as suggested, Al Sheehy is another mod or, there should be a red x at the top right of your original post which reports the post & you can make a comment in there asking them to move it...

Cheers
Reply With Quote
  #9  
Old 24-12-2019, 10:41 PM
sharpiel
Registered User

sharpiel is offline
 
Join Date: Jun 2010
Posts: 715
Quote:
Originally Posted by Outcast View Post
At present I'm contemplating a circular concrete pad, done in such a manner as to look like a decorative feature that I can mark a nth/sth line on for setting up my CG 5 but, the pier footing you have shown is also very interesting indeed...
Would it be possible to make that decorative feature a sundial in any way even if your Cardinal points weren't NS alone...? Just a thought...
Reply With Quote
  #10  
Old 25-12-2019, 08:16 AM
Outcast's Avatar
Outcast (Carlton)
Always gonna be a NOOB...

Outcast is offline
 
Join Date: Oct 2008
Location: Cairns, Qld
Posts: 1,285
Quote:
Originally Posted by sharpiel View Post
Would it be possible to make that decorative feature a sundial in any way even if your Cardinal points weren't NS alone...? Just a thought...


It's funny that you say that; I literally had that conversation with my wife last night....

My thinking is that Solar Noon position of a stick as described in other threads regarding finding true South would, provide the Midday (or near enough) position for a sun dial. The Northern position would be the 6....

When laying the concrete, it occurred to me that if I put a piece of conduit or dowl in the centre as part of the form work then work out solar noon, paint a lovely sundial pattern & voila... Sundial by day, Astro pad by night & everybody's happy...

Cheers
Reply With Quote
  #11  
Old 26-12-2019, 12:45 PM
morls (Stephen)
Space is the place...

morls is offline
 
Join Date: Sep 2009
Location: Melbourne
Posts: 696
Quote:
Originally Posted by Outcast View Post
Stephen, I'm really watching this with interest... I'm keen to read about your progress, as well as your analysis on whether or not you think it's stable enough between now & your eventual move...
Hi Carlton,

A quick session the other night was promising, but there is some instability. I've reduced the gap between pier and footing as much as possible without removing the nuts between, and will see what fifference this makes. I wasn't too fussed about getting the footing completely level, my reasoning being that the rat cage would make this adjustment once set up. I think in the next installation I'll try to make sure the footing is as level as possible so I can attach the pier directly to footing. We started with it level, but as the first pile was driven in the plate shifted. It was at that point that I decided to let the rat cage do the levelling. My next step will be to remove the pier and widen the mounting hole in the base. I bought it from another IIS member, and these holes are just too close for a clean fit onto the footing. A few minutes with a file will sort this out.



Quote:
Originally Posted by Outcast View Post
Would you mind elaborating on cost of the plate you used (I'd never seen those before) & whether you already had the pier or purchased it complete/had it made for you, etc... & rough costs...

The pier was purchased through this forum, from Bo (traveller). The total cost for footing plate, micro piles and nuts/bolts/washers was $220. The plate was $150, so the next install will be much cheaper.
I bought the S400: https://surefootfootings.com.au/pile-cap-s400/


Cheers
Reply With Quote
  #12  
Old 26-12-2019, 09:49 PM
Outcast's Avatar
Outcast (Carlton)
Always gonna be a NOOB...

Outcast is offline
 
Join Date: Oct 2008
Location: Cairns, Qld
Posts: 1,285
Many thanks Stephen...

I would like to put a pier in as it would save some equipment lugging & make alignments & PA so much easier but, alas I suspect Min. War & Finance will not be keen on a pier & a circular pad...

I'm still thinking through my pad design & whether to mix the concrete myself or get someone in to do it professionally (significant cost differential I think). The marking out, digging & form work will be all me.. Min W&F wants it slightly subsurface but, I'm not entirely sure how to accomplish that with good screeding (I think that's the term). Still gotta contend with how deep (or not) the old septic tank is...

Once I get my Nth/Sth line reliably down, I'll probably look to make some indentations in the pad to enable me to place the tripod feet in the same spot time after time after time...

Not withstanding cost of your pier, seems like a fairly cost effective outcome...

Cheers
Reply With Quote
  #13  
Old 27-12-2019, 12:48 PM
morls (Stephen)
Space is the place...

morls is offline
 
Join Date: Sep 2009
Location: Melbourne
Posts: 696
Yes, I'm happy with the cost considering it's able to be moved. I had another session last night, and will be making some further adjustments. I think I might reduce the height of the extension, as this seems to be where a lot of the instability is.
Nice to have a project...
Reply With Quote
  #14  
Old 12-01-2020, 07:32 AM
morls (Stephen)
Space is the place...

morls is offline
 
Join Date: Sep 2009
Location: Melbourne
Posts: 696
After recent rain I decided to move the pier. The process of removing the micropiles was very straightforward, and I took the opportunity to bolt the pier directly to the footing. I hope this will add stability.
I haven't tested yet, but it's very solid now. It still vibrates if I give it a tap, but I'm not sure if this is unavoidable. It this normal? When I say tap, I mean a moderately strong hit with my hand. The NEQ6 head vibrates for several seconds before settling. It seems to settle more quickly after this second installation.
Sorry about the sideways pics, can't rotate them as attachments...
Attached Thumbnails
Click for full-size image (pier1-1.JPG)
56.2 KB77 views
Click for full-size image (pier2-1.JPG)
52.3 KB63 views
Reply With Quote
  #15  
Old 12-01-2020, 08:57 AM
Outcast's Avatar
Outcast (Carlton)
Always gonna be a NOOB...

Outcast is offline
 
Join Date: Oct 2008
Location: Cairns, Qld
Posts: 1,285
Would introducing say 5mm of high density rubber between the base & the mount perhaps provide some vibration damping without compromising the stability of the pier/mount?

Just a thought bubble...
Reply With Quote
  #16  
Old 12-01-2020, 09:06 AM
Sunfish's Avatar
Sunfish (Ray)
Registered User

Sunfish is offline
 
Join Date: Mar 2018
Location: Wollongong
Posts: 1,909
The pier is quite tall and the gussets quite short. My guess is the shs is also not as thick as could be. So vibration. Longer gussets or tek screw pipe braces from the pier base corners.

Last edited by Sunfish; 12-01-2020 at 09:06 AM. Reason: Spelling
Reply With Quote
  #17  
Old 12-01-2020, 09:10 AM
Sunfish's Avatar
Sunfish (Ray)
Registered User

Sunfish is offline
 
Join Date: Mar 2018
Location: Wollongong
Posts: 1,909
And then use welds at the plate / micro pile connection. 450 is not very long for a pile.
Reply With Quote
  #18  
Old 12-01-2020, 09:29 AM
DarkArts
Registered User

DarkArts is offline
 
Join Date: Dec 2014
Posts: 606
Quote:
Originally Posted by Sunfish View Post
And then use welds at the plate / micro pile connection. 450 is not very long for a pile.
Welds may make the foundation piles difficult to remove.

Stephen - How did you get the micropiles out anyway? What tool(s) did you use?
Reply With Quote
  #19  
Old 12-01-2020, 01:50 PM
morls (Stephen)
Space is the place...

morls is offline
 
Join Date: Sep 2009
Location: Melbourne
Posts: 696
Quote:
Originally Posted by Outcast View Post
Would introducing say 5mm of high density rubber between the base & the mount perhaps provide some vibration damping without compromising the stability of the pier/mount?
I'm not sure. The vibration seems to be some sort of harmonic resonance type of response, and so I think it's a function of the pier itself.


Quote:
Originally Posted by Sunfish View Post
use welds at the plate / micro pile connection. 450 is not very long for a pile.
Yes, the piles are short, and could be longer. It all seems rock solid at the base though, so I don't think this is the issue. Hesitant to weld because I like the option of disassembly.

Longer gussets might do the trick.

Quote:
Originally Posted by DarkArts View Post
How did you get the micropiles out anyway? What tool(s) did you use?
After removing the tek screws I used a pipe wrench to rotate the pile, and with upward pressure as I turned it moved quite easily.
Reply With Quote
  #20  
Old 13-01-2020, 10:03 AM
morls (Stephen)
Space is the place...

morls is offline
 
Join Date: Sep 2009
Location: Melbourne
Posts: 696
Last night was clear so I was able to test the setup. It's much more stable now compared to the previous install, and when slewing at rates of 3 - 5 there is no vibration visible through the eyepiece.

While adjusting focus there is some movement, but once this settles down it's very good. I think with practice I can reduce the lateral movement when adjusting focus, so I'm very happy overall.
Reply With Quote
Reply

Bookmarks

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time is now 12:14 PM.

Powered by vBulletin Version 3.8.7 | Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Advertisement
Bintel
Advertisement
Testar
Advertisement