Thanks Marc.
I was thinking along those lines....but, if I don't lift the mount higher on a pier extension of some sort I'd need to lift the dec axis out about
2.5" min. which seems like a lot. Maybe I could make something out of RHS steel but then I wonder about shear loads on such long bolts?
Peter
|