Old 30-03-2015, 12:43 PM
h0ughy's Avatar
h0ughy (David)
Moderator

h0ughy is offline
 
Join Date: Apr 2005
Location: NEWCASTLE NSW Australia
Posts: 33,157
To get the next concreting bit done on Thursday I have had to roughly set out the location of the dome slab so that the angle for the next slab will be right alignment. Also note that for the dome I have opted to make a decorative sleeper slab which will be protected by black plastic for the pour - whenever that happens , then have infill of 4.4m3 of reo and concrete, so the outside will be timber. I have yet to dig them into the level position