View Single Post
  #17  
Old 28-02-2019, 09:07 PM
gb44 (Glenn)
Registered User

gb44 is offline
 
Join Date: Jul 2012
Location: Gold Coast
Posts: 275
Diego
Get it tied down quick fast mate!

Dig 4 holes or more say 300x300 x500 deep under the frame edging. Drill 12mm hole thru the bottom plate of the wall. Use say 12mm thread bar. One big washer and nut and pass the thread bar through the timber into the hole in the dirt. Let it touch the dirt at the bottom of the hole. The thread bar could be 650mm long by the look of it.

Place post hole concrete into the hole stopping 100mm from the surface. No mixing required. When you leave the rental just cut the threadbar off at the concrete and place new grass sod in the hole. Say no more.

Quick job. Bunnings have all this stuff.

Cheers
GlennB
Reply With Quote