Quote:
Originally Posted by jamespierce
And yes the two halves of the clam shell require some strength and a little technique to lift into place! Happy to share any more details of my build if it helps you in the future Paul. The light panel setup works extremely well and only requires a small electrical modification to trigger using the light circuit - no other holes or permanent changes to the dome required.
|
The use of glazing suction handles works well in dealing with the weight and ungainly nature of the panels.
There is a possible 5m dome installation coming up in the next year or so. Crane hire will be needed to lift the panels.
I would be interested in the mod wiring detail. It never occurred to me use a panel in that spot.