View Single Post
  #23  
Old 18-09-2018, 04:47 AM
Allan's Avatar
Allan
Registered User

Allan is offline
 
Join Date: Feb 2013
Location: Newcastle
Posts: 937
I sheeted the dob pad with 18mm compressed concrete. It's very strong, and heavy. I left a 20mm gap between the dob pad and floor joists, to avoid any vibration transfer to the dob. I sealed the gap with 20mm open cell foam to keep the dust and critters out.
Attached Thumbnails
Click for full-size image (3.jpg)
94.2 KB75 views
Reply With Quote