I sheeted the dob pad with 18mm compressed concrete. It's very strong, and heavy. I left a 20mm gap between the dob pad and floor joists, to avoid any vibration transfer to the dob. I sealed the gap with 20mm open cell foam to keep the dust and critters out.
|