Hi everyone, after a 6 hr drive down to 40Km/hr in places, a puncture with a bolt 10 km in and a crane lift, after coming to the conclusion i was not putting it up there with the telehandler... it's up... All went pretty smoothly to be honest, no scares thankfully. I've put the scope in, polar aligned, collimated, eliminated any chip tilt, next is some cable management and a Tpoint model then get the automation process underway etc.
Cheers
Josh
|