Well it's been a few hard days and the framing is complete, the Hardi Primelok cladding is complete and the roll off roof structure is complete.
I ended up getting a bifold window worth $3000 for $1000 and installed it and it makes it look very good as it's right at the back of my new house.
Now just the roofing sheets and a door and some flashings/cappings to finish it off.
The frame is all steel so the whole building is fire proof.
I will also need electricity connected to it.
Pier is ready to be fixed (it's heavy).
The roll off roof is a dream and the framing is lightweight aluminium 50mm square section. Sliding gate rails and matching wheels roll easily. The roof is split into 2 halves and can roll off either way or together to reveal the whole available sky (limited).
Should have it 100% done this week.
I'll post some photos tomorrow.
Greg.
|