Quote:
Originally Posted by AstroApprentice
Thanks for the advice, I like the longer pipe embedded in footing, and sand filled options. However, I’ve been advised that the 5 mm walls are too thin to avoid flexure over 2 m length. I’ll see if I can source thicker walled pipe or might have to explore concrete pier options.
|
Mine is around 1.8m high, no sand for vibrations, carries an eq6 and 13.5kg of gear and has 4mm walls.
Bolted to a concrete shed floor......goes fine