Thanks David
Slab is poured and angled for water release
Apart from one cable running from the shed to the POD one meter away there are two cables running from the side of the POD to the peer. These cables will run in an on the ground flat cable tray which is not much higher than the flooring I will lay on completion. The power to the POD will be connected to a weather proof power point on the side and all power cables run neatly around the edge.