View Single Post
  #74  
Old 18-09-2019, 12:19 PM
xelasnave's Avatar
xelasnave
Gravity does not Suck

xelasnave is offline
 
Join Date: Mar 2005
Location: Tabulam
Posts: 16,930
Back down in Sydney and started on the pier for the 80mm. It needs to be short so everything will fit in the four foot between the floor and the roof.
It has a long way to go but I show these early stages so you can see the ply as when finished all the ply will be black.
The way I do this is to mix black tile grout with the resin before I add hardener. But it's just routine fibre glass routine although I do overlay the glass with impregnated paper to give it a smooth surface and remove the necessity to sand.

Edit. Near done. See last photo.
Alex
Attached Thumbnails
Click for full-size image (IMG20190917110913_resize_46.jpg)
85.7 KB89 views
Click for full-size image (IMG20190917110851_resize_44.jpg)
137.3 KB87 views
Click for full-size image (IMG20190917120307_resize_53.jpg)
68.9 KB81 views
Click for full-size image (IMG20190925175056_resize_52.jpg)
88.9 KB64 views

Last edited by xelasnave; 25-09-2019 at 06:00 PM.
Reply With Quote