Great stuff Lee. What are the holes in the side, near the top -are they threaded for part of a cable management system or something?
|
We set a few 25mm long link nuts into the concrete, basically to add the option to easily attach things to the pier without having to drill it later. Will also mount the Gemini control box there (if cables long enough).
I just drilled 8mm holes in the formwork, and had the nut on the inside, held there by an 8mm bolt, long enough to fill the thread up and go through the 19mm formwork timber. Greased the thread first, and plugged the end of the nut with grease to stop it filling with concrete. Then filled her up....
Worked well I think.
Should hold an EP tray etc etc....