Today I have assembling more items on the EQ6 mount. I have measure the needed thickness of the RA and DEC shafts shims. I also checked if the length of the timing belts are correct, amost but have to do some modifications.
Here is photo and info of todays work on the EQ6 mount:
http://www.astrofriend.eu/astronomy/...ebuilding.html
/Lars