I wouldnt even worry about grinding the rock flat.
Just drill the holes so you can anchor the pier and use a small 1" packer in the middle to allow it to be set level.
Once level, just use dry pack grout to fill the space under the baseplate and when set, fully tension the hold down nuts.
Andrew
|