View Single Post
  #7  
Old 11-11-2018, 08:35 AM
Imme (Jon)
Registered User

Imme is offline
 
Join Date: Aug 2017
Location: Kyneton
Posts: 840
Quote:
Originally Posted by AstroApprentice View Post
Thanks for the advice, I like the longer pipe embedded in footing, and sand filled options. However, I’ve been advised that the 5 mm walls are too thin to avoid flexure over 2 m length. I’ll see if I can source thicker walled pipe or might have to explore concrete pier options.
Mine is around 1.8m high, no sand for vibrations, carries an eq6 and 13.5kg of gear and has 4mm walls.
Bolted to a concrete shed floor......goes fine

Last edited by Imme; 16-11-2018 at 11:13 PM.
Reply With Quote