It rained last night and no water got in except one small area where I haven't clad the other gable yet.
I put the first of the flashings where the 2 halves of the roof meet. I'll do the other side this afternoon and see how well it works. I'll post a photo of the flashing so you can see the design.
Basically it goes across 2 ribs and folds down slightly on the top of a corrugation. Then steps up 20mm and continues across another 150mm,
The step up is to allow one of the roofs to roll under the flashing.
Greg.
|