Thanks Rick!
The rebar isn't so much to prevent cracking, I'm driving some into the ground radiating outwards at a 30 odd degree angle to minimise on the size of the pad a little and I'll drive some more vertical rods down to tie my stainless threaded rod to so it doesn't move during pouring.
I could drill holes post block but I used to install car hoists and know what sort of dramas can arise drilling through concrete.
|