View Single Post
  #172  
Old 29-06-2016, 08:08 PM
h0ughy's Avatar
h0ughy (David)
Moderator

h0ughy is offline
 
Join Date: Apr 2005
Location: NEWCASTLE NSW Australia
Posts: 33,177
forging on

forging on

tomorrow i am getting the data connection put in for the network from the modem to the observatory, and Friday I will have the power put on.

I am making sure i have enough power and network connections

At that point i can put in the pier.

now i have indicated south and magnetic south so if i align the pier to magnetic i should be able to move the mount to true south easier?

Now i am a little hesitant as i think i might need to raise the pier by a tad, not sure about that yet as my light dome horizon would be masked out by the walls and the slit opening. I was thinking about a steel section?

after that i can put in the computer and the mount.
Attached Thumbnails
Click for full-size image (20160629_162545web.jpg)
179.7 KB81 views
Click for full-size image (20160629_171305web.jpg)
194.3 KB77 views
Click for full-size image (20160629_171357web.jpg)
196.3 KB85 views
Click for full-size image (20160629_171845web.jpg)
196.5 KB113 views
Click for full-size image (20160629_172826web.jpg)
191.0 KB70 views
Click for full-size image (20160629_174341web.jpg)
161.1 KB92 views
Reply With Quote